This cooling tower is published with the manufacturer’s full specification — type Plant. Made by Qingdao Chengzhi United Tech Power Engineering Co., Ltd. (1 year on the platform, typical reply ≤8h). Send your target quantity and destination for a firm quotation with current lead times.
Key Features of This Cooling Tower
- Warranty: 1 Year
- Place Of Origin: Shandong, China
- Application: steam turbine
- Application1: power plant
- Application2: Single Stage, Multi Stage
- Electricity Generator Type: Coal
Technical Specifications
| Electricity Generator Type | Coal |
|---|---|
| Core Components | Motor, Pump, Engine |
| Machinery Test Report | Provided |
| Video Outgoing-Inspection | Provided |
| Warranty | 1 Year |
| Type | Plant |
| Key Selling Points | High Efficiency and good performance |
| Place Of Origin | Shandong, China |
| Brand Name | CZ POWER |
| Name | Emergency Governor Pilot Valve |
| Application | steam turbine |
| Application1 | power plant |
| Type 2 | condensing |
| Type 3 | Extracting-condensing |
| Application2 | Single Stage, Multi Stage |
| NANJING | TURBINE |
| HANGZHOU | TURBINE |
| JIENENG | TURBINE |
| Selling Units | Single item |
| Single Volume | 0 cm³ |
| Single Gross Weight | 0.0 kg |
Ordering and Pricing
- Minimum order quantity: 1 set
- Volume pricing:
- 1–4 set: US $50000 / set
- 5+ set: US $5000 / set
- Ships from: China
- Customization: OEM and ODM accepted on qualifying volumes.
Frequently Asked Questions
What is the minimum order quantity for this cooling tower?
The standard minimum order quantity is 1 set. Trial orders can usually be arranged for buyers evaluating the product before a full production run.
What warranty is provided?
The manufacturer provides a 1 Year warranty. Spare parts and technical support remain available after the warranty period.
Do you accept OEM or custom branding?
Yes. Custom logo, colour, packaging and specification changes are accepted on qualifying order volumes. Send your artwork and technical requirements with your enquiry.
How long does production and delivery take?
In-stock configurations typically ship within 7–15 days. Customised or large-volume orders are usually produced in 25–35 days, confirmed on order.
About the Manufacturer
This product is produced by Qingdao Chengzhi United Tech Power Engineering Co., Ltd., based in China. The company 1 years as a verified Alibaba.com supplier, Trading Company. Browse the full Qingdao Chengzhi United Tech Power Engineering Co., Ltd. range on HVACR Nexus.
See more in Cooling Towers on HVACR Nexus.

















