The dry cooler listed here carries 2KW, material Metal, documented exactly as the manufacturer publishes it. Made by Shenzhen Letine Technology Co., Ltd. (2 years on the platform, typical reply ≤5h). For a binding price and lead time, send the volume you need and where it ships to.
Key Features of This Dry Cooler
- Rating Power: > 1000W
- Power Consumption: 2KW
- Video Memory Capacity: Other
- Material: Metal
- Warranty(Year): 180 Days
- Place Of Origin: Guangdong, China
Technical Specifications
| Chipset Manufacturer | Other |
|---|---|
| Video Memory Capacity | Other |
| Memory Interface | Other |
| Rating Power | > 1000W |
| Warranty(Year) | 180 Days |
| After-Sales Service | Call Center and on-line Technical Support |
| Products Status | Stock |
| Private Mold | Yes |
| Packaging | Wodden Box |
| Style | Other |
| Material | Metal |
| Encryption | Yes |
| Algorithm | SHA-256 |
| Hashrate | Antminer Hydro Machine |
| Memory Clock(Mhz) | 50-60Hz |
| Power Consumption | 2KW |
| Place Of Origin | Guangdong, China |
| Brand Name | LETINE |
| Manufacturer | Letine |
| Type | Hydro Cooling Solution |
| Selling Units | Single item |
| Single Volume | 0 cm³ |
| Single Gross Weight | 0.0 kg |
Product Details
Model | 6 Hydro-cooling Rack |
Parameter | Water cooler 50KW Dry Cooler 380V PDU With pipes negotiable |
Capacity | 6 pieces |
Dimensions | External cabinet: 800mm*750mm*1380mm Dry Cooler: 1100mm*1100mm *1400mm |
PACKING LIST | Cabinet Packing Size: 840mm*850mm*1690mm G.W: 220KG Dry Cooler Packing Size: 1150mm*1230mm*1550mm G.W: 210KG |


























Ordering and Pricing
- Minimum order quantity: 1 set
- Volume pricing:
- 1+ set: US $2071 / set
- Ships from: China
- Customization: OEM and ODM accepted on qualifying volumes.
Frequently Asked Questions
What is the minimum order quantity for this dry cooler?
The standard minimum order quantity is 1 set. Trial orders can usually be arranged for buyers evaluating the product before a full production run.
What warranty is provided?
The manufacturer provides a 180 Days warranty. Spare parts and technical support remain available after the warranty period.
Do you accept OEM or custom branding?
Yes. Custom logo, colour, packaging and specification changes are accepted on qualifying order volumes. Send your artwork and technical requirements with your enquiry.
How long does production and delivery take?
In-stock configurations typically ship within 7–15 days. Customised or large-volume orders are usually produced in 25–35 days, confirmed on order.
About the Manufacturer
This product is produced by Shenzhen Letine Technology Co., Ltd., based in China. The company 2 years as a verified Alibaba.com supplier, Trading Company. Browse the full Shenzhen Letine Technology Co., Ltd. range on HVACR Nexus.
See more in Dry Cooler on HVACR Nexus.

















