Guangzhou Airking Compressor Co., Ltd.
Showing all 2 results
-
Centrifugal Turbo Air Compressor, 22KW, 75KW
$27,785.00- 380V/3/50hz
- AC Power
-
Roots Blower, Centrifugal, 380V
$12,313.56- 380V/3/50hz
- AC Power
Source Directly from Guangzhou Airking Compressor Co., Ltd.
Tell us which model and quantity you need. We handle the enquiry, the specification check and the quotation, and come back with pricing and lead time.
What Guangzhou Airking Compressor makes
Other manufacturers in the same categories
Comparable suppliers listing in Blowers — useful for a second quotation or a backup source.
- Dongguan Sop Mechanical And Electrical Co., Ltd.15
- Jiangxi Sop Industrial Co., Ltd.14
- Jinan Golden Bridge Precision Machinery Co., Ltd.12
- Shandong Maibte Power Technology Co., Ltd.9
- Jiangxi Slovdson Intelligent Equipment Co., Ltd.8
- Foshan Zhemu Electromechanical Co., Ltd.7
- Shandong Huadong Blower Co., Ltd.7
- Zhongshan Aobaite Metal Industrial Co,. Ltd.7
Questions buyers ask about Guangzhou Airking Compressor
What is the minimum order quantity?
MOQ is set per model and depends on whether the item is a stock line or built to order, so it is quoted rather than published. Send the model or specification with your target volume and the current MOQ comes back with the quotation.
Does Guangzhou Airking Compressor accept OEM or ODM orders?
OEM and ODM are accepted on qualifying volumes across most listings — typically covering branding, colour, packaging and specification changes. What counts as a qualifying volume varies by product, so confirm it with your enquiry.
What certifications are available?
The approvals held vary by model rather than applying across the whole range. The specification tabs above show what each listing carries; if your market requires a particular approval, state it in the enquiry so only compliant models are quoted.
What are typical lead times?
Stock items ship in days; built-to-order production usually runs in weeks and depends on volume and season. Lead time is confirmed with the quotation because it moves with the order book.
Can I order a sample first?
Trial orders can normally be arranged before committing to a production run. Sample cost and whether it is credited against the first order are confirmed case by case.

