Economizer Coil, Steel, Boiler Tube - view 2
Economizer Coil, Steel, Boiler Tube - view 3
Economizer Coil, Steel, Boiler Tube - view 4
Economizer Coil, Steel, Boiler Tube - view 5
Economizer Coil, Steel, Boiler Tube - view 6

Economizer Coil, Steel, Boiler Tube

$1,000.00

Economizer Coil — material Steel, type Boiler Tube. Factory-direct from a verified manufacturer, full specification published.

Type
Boiler Tube
Material
Steel
Place Of Origin
Shandong, China
  • Reply within one working day
  • Factory-direct pricing, OEM & ODM accepted
  • Full specification and test reports supplied

Get Factory Pricing

Price, MOQ and lead time direct from the manufacturer. Free, no account needed.

Enquiring about Economizer Coil, Steel, Boiler Tube

This economizer coil is published with the manufacturer’s full specification — material Steel, type Boiler Tube. Made by Shandong Longsheng Biotechnology Co., Ltd. (9 years on the platform, typical reply ≤13h). For a binding price and lead time, send the volume you need and where it ships to.

Key Features of This Economizer Coil

  • Material: Steel
  • Place Of Origin: Shandong, China
  • Type: Boiler Tube
  • Weight (Kg): 1
  • Single Gross Weight: 0.0 kg
  • Machinery Test Report: Provided

Technical Specifications

Type Boiler Tube
Material Steel
Machinery Test Report Provided
Video Outgoing-Inspection Provided
Weight (Kg) 1
Place Of Origin Shandong, China
Brand Name LSBiotech
Header(S) with/without
Selling Units Single item
Single Volume 0 cm³
Single Gross Weight 0.0 kg

Product Details

Product Parameter
Product Name
Economizer for Boiler
Structure Type
Tube Coil  Serpentine Coil
Tube Material
– Carbon Steel : 20#, 20G, A195, A-1
– Corten Class Low Alloy Steel : Corten Steel, ND Steel (09CrCuSb)
– Alloy Steel : 15CrMoG, T11
Standard
China GB, ASME
Manufacturer Grade
China A Grade, ABS Certificated, TUV Certificated
Tube Type
– Bare Tube
– Fin Tube
Tube Specification
As per Customer requirements
Tube Thickness
As per Customer requirements
Working Pressure
1.6 MPa ~ 13.2 MPa
Working Temperature
depends on material
Welding
Automatic GTAW (TIG) tube butt welding
Welding NDT
Automatic RT 100%
Product Show
Economizer Coil, Steel, Boiler Tube - detail 1Economizer Coil, Steel, Boiler Tube - detail 2
Economizer Coil, Steel, Boiler Tube - detail 3Economizer Coil, Steel, Boiler Tube - detail 4
Economizer Coil, Steel, Boiler Tube - detail 5Economizer Coil, Steel, Boiler Tube - detail 6
Economizer Coil, Steel, Boiler Tube - detail 7Economizer Coil, Steel, Boiler Tube - detail 8
Economizer Coil, Steel, Boiler Tube - detail 9Economizer Coil, Steel, Boiler Tube - detail 10
Economizer Coil, Steel, Boiler Tube - detail 11Economizer Coil, Steel, Boiler Tube - detail 12
Economizer Coil, Steel, Boiler Tube - detail 13Economizer Coil, Steel, Boiler Tube - detail 14
Factory Show & QA
Economizer Coil, Steel, Boiler Tube - detail 15Economizer Coil, Steel, Boiler Tube - detail 16
Economizer Coil, Steel, Boiler Tube - detail 17Economizer Coil, Steel, Boiler Tube - detail 18
Economizer Coil, Steel, Boiler Tube - detail 19Economizer Coil, Steel, Boiler Tube - detail 20
Economizer Coil, Steel, Boiler Tube - detail 21Economizer Coil, Steel, Boiler Tube - detail 22
Economizer Coil, Steel, Boiler Tube - detail 23Economizer Coil, Steel, Boiler Tube - detail 24
Economizer Coil, Steel, Boiler Tube - detail 25Economizer Coil, Steel, Boiler Tube - detail 26
Economizer Coil, Steel, Boiler Tube - detail 27Economizer Coil, Steel, Boiler Tube - detail 28
Economizer Coil, Steel, Boiler Tube - detail 29Economizer Coil, Steel, Boiler Tube - detail 30
Packing & Delivery

Packing

Different packing methods are chosen depend on transportation type.

Economizer Coil, Steel, Boiler Tube - detail 31Economizer Coil, Steel, Boiler Tube - detail 32

1. Plywood Protection

for special material protection
Economizer Coil, Steel, Boiler Tube - detail 33Economizer Coil, Steel, Boiler Tube - detail 34

2. Plywood Box Packing 

for small and high value product
Economizer Coil, Steel, Boiler Tube - detail 35Economizer Coil, Steel, Boiler Tube - detail 36

3. Steel Frame Packing

for general product
Economizer Coil, Steel, Boiler Tube - detail 37Economizer Coil, Steel, Boiler Tube - detail 38

4. Steel Frame Packing

for general product
Economizer Coil, Steel, Boiler Tube - detail 39Economizer Coil, Steel, Boiler Tube - detail 40

5. Steel Frame Packing

for general product
Economizer Coil, Steel, Boiler Tube - detail 41Economizer Coil, Steel, Boiler Tube - detail 42

6. Steel Frame Packing

for general product
FAQ

Q: How long is your delivery time?

A: General small equipment will be ready for shipment  in 20-25 days if the materials are in stock, or in 35-40 days if the materials are not in stock.

Large equipment delivery time should be determined after technical discussion. Please contact our sales.

Q: Do you provide samples ? Is it free or extra ?

A: Yes, we could offer the sample tube or sample materials for free charge, but the cost of freight should be paid by Customer.

Q: What is your terms of payment ?

A: General small equipment, the 100% of contract price should be paid after signing.  Alibaba third party guarantee is available. 

Large equipment payment schedule, please contact our sales.

Q: How long is the warranty period?

A: General small equipment we guarantee 12 months from the date of shipment departure.

Large equipment warranty period is 12 months from the date of commissioning or 18 months from the date of shipment departure which occurs earlier.

Contact us
Economizer Coil, Steel, Boiler Tube - detail 43Economizer Coil, Steel, Boiler Tube - detail 44

Ordering and Pricing

  • Minimum order quantity: 1 set
  • Volume pricing:
    • 1+ set: US $1000 / set
  • Ships from: China
  • Customization: OEM and ODM accepted on qualifying volumes.

Frequently Asked Questions

What is the minimum order quantity for this economizer coil?

The standard minimum order quantity is 1 set. Trial orders can usually be arranged for buyers evaluating the product before a full production run.

Do you accept OEM or custom branding?

Yes. Custom logo, colour, packaging and specification changes are accepted on qualifying order volumes. Send your artwork and technical requirements with your enquiry.

How long does production and delivery take?

In-stock configurations typically ship within 7–15 days. Customised or large-volume orders are usually produced in 25–35 days, confirmed on order.

About the Manufacturer

This product is produced by Shandong Longsheng Biotechnology Co., Ltd., based in China. The company 9 years as a verified Alibaba.com supplier, Trading Company. Browse the full Shandong Longsheng Biotechnology Co., Ltd. range on HVACR Nexus.

Type

Boiler Tube

Material

Steel

Machinery Test Report

Provided

Video Outgoing-Inspection

Provided

Weight (Kg)

1

Place Of Origin

Shandong, China

Brand Name

LSBiotech

Header(S)

with/without

Selling Units

Single item

Single Volume

0 cm³

Single Gross Weight

0.0 kg

More from Shandong Longsheng Biotechnology Co., Ltd.

Other equipment from the same manufacturer — one enquiry can cover several items.

Compare Other Boiler Parts

Alternatives in the same category, from different verified suppliers.

Explore related

Specifications, certifications and images on this page are as published by the manufacturer and have not been independently tested or verified by HVACR Nexus. Confirm the full specification and the approvals valid in your market in writing before ordering. Content & IP notice