The air handling units listed here carries voltage 3*380V/3*400V/3*440V, power factor >95%, documented exactly as the manufacturer publishes it. Made by Chengdu Jinkezhi Electronic Co., Ltd. (15 years on the platform, factory-assessed). Send your target quantity and destination for a firm quotation with current lead times.
Key Features of These Air Handling Units
- Power Factor: >95%
- Output Power: 25KW
- Voltage: 3*380V/3*400V/3*440V
- Warranty: 1 year
- Place Of Origin: Sichuan, China
- Type: Induction Furnace
Technical Specifications
| Usage | Heat Treatment Furnace |
|---|---|
| Voltage | 3*380V/3*400V/3*440V |
| Type | Induction Furnace |
| Core Components | IGBT |
| Warranty | 1 year |
| Machinery Test Report | Provided |
| Video Outgoing-Inspection | Provided |
| Key Selling Points | Energy Saving |
| Place Of Origin | Sichuan, China |
| Weight (T) | 0.03 |
| Brand Name | JKZ |
| Dimension(L*W*H) | 500*500*800mm |
| Output Frequency | 20-40KHZ |
| Duty Cycle | 100% |
| Power Factor | >95% |
| Cooling Type | Air cooling |
| Output Power | 25KW |
| Heating Cable Length | 10m/15m/25m |
| Selling Units | Single item |
| Single Volume | 0 cm³ |
| Single Gross Weight | 0.0 kg |
Product Details










oil and gas pipeline jionts welding heat treatment machine product features:
1. Heat treatment of metals: hardening, tempering, and annealing.
2. Heating prior to deformation: forging, swaging, upsetting, bending, and piercing.
3. Brazing and Soldering: brazing of steel, brass, and copper to each other in combination and aluminum to aluminum.
4. Shrink fitting: In any manufacturing process, for example, shrink fitting of motor rotors to shafts, shrink fitting of shell casings for compressors.
5. Coating: Of dissimilar metals, prior to insulation, and curing, such as paint.
6. Melting: Of all types of metals.
7. Other applications include crystal growing, cap sealing, sintering, carbon vapor deposition, levitation, exit axial deposition, and plasma generation.


oil and gas pipeline jionts welding heat treatment machine oil and gas pipeline jionts welding heat treatment machine product features:
IGBT (SIEMENS) technology, high conversion efficiency; Energy saving 15%-30% , compared to SCR/KGPS technology
Much more efficient than gas-fired and coal-fired method
100% start-up success rate; power factor > 95%
Perfect and complete protection functions, increasing machine's reliability & stability
No special foundations required, Low operating cost, Easy operation
Modular design, ease of maintaining and repairing
products advantages
Energy saving, Environmental protection, Low pollution level
Easy operation, can be equipment with PLC controller
Miniature and light weight, Economic Space Occupation, Easy installation
Enhanced monitoring and diagnostics system—"JKZ-PS" device, guarantee the machine of high stability, reliability and security.
Strict Supplier Management System and ISO9001-2008 Quality Management System guarantee high quality of each equipment.
Customized services, producing machines according to customer's requirement.
Ordering and Pricing
- Minimum order quantity: 3 set
- Volume pricing:
- 3+ set: US $8000 / set
- Ships from: China
- Customization: OEM and ODM accepted on qualifying volumes.
Frequently Asked Questions
What is the minimum order quantity for this air handling units?
The standard minimum order quantity is 3 set. Trial orders can usually be arranged for buyers evaluating the product before a full production run.
What warranty is provided?
The manufacturer provides a 1 year warranty. Spare parts and technical support remain available after the warranty period.
Can the air handling units be supplied for my local voltage?
The standard configuration is 3*380V/3*400V/3*440V. Alternative voltage and frequency builds are available when specified at the time of order.
Do you accept OEM or custom branding?
Yes. Custom logo, colour, packaging and specification changes are accepted on qualifying order volumes. Send your artwork and technical requirements with your enquiry.
How long does production and delivery take?
In-stock configurations typically ship within 7–15 days. Customised or large-volume orders are usually produced in 25–35 days, confirmed on order.
About the Manufacturer
This product is produced by Chengdu Jinkezhi Electronic Co., Ltd., based in China. The company 15 years as a verified Alibaba.com supplier, operates its own manufacturing, passed third-party supplier assessment. Browse the full Chengdu Jinkezhi Electronic Co., Ltd. range on HVACR Nexus.
See more in Air Handling Units on HVACR Nexus.














