Steam boiler — material Carbon Steel, type Natural Circulation. The complete factory specification follows. Made by Zhangjiagang Hua Dong Boiler Co., Ltd. (10 years on the platform, factory-assessed). Send your target quantity and destination for a firm quotation with current lead times.
Key Features of This Steam Boiler
- Material: Carbon Steel
- Warranty: 1 Year
- Place Of Origin: Jiangsu, China
- Application: power plant
- Type: Natural Circulation
- Fuel Type: Coke Oven Gas
Technical Specifications
| Output | Hot Water |
|---|---|
| Usage | Industrial |
| Fuel | Coal-fired |
| Pressure | High Pressure |
| Structure | Water Tube |
| Type | Natural Circulation |
| Material | Carbon Steel |
| Key Selling Points | High-Accuracy |
| Style | Horizontal |
| Warranty | 1 Year |
| Video Outgoing-Inspection | Provided |
| Machinery Test Report | Provided |
| Weight (Kg) | 22500 |
| Place Of Origin | Jiangsu, China |
| Brand Name | HDB |
| Dimension(L*W*H) | Depends |
| After-Sales Service Provided | No overseas service provided |
| Port | Shanghai |
| Product Name | Steam boiler spare parts superheater and reheater HD China |
| Application | power plant |
| Design Fuel | Coal Fuel |
| Color | Customer’s Requirement |
| Thermal Efficiency | 92.4%–94.5% |
| Fuel Type | Coke Oven Gas |
| Working Pressure | High pressure |
| Selling Units | Single item |
| Single Package Size | 10500X1890X1450 cm |
| Single Gross Weight | 15800.0 kg |
Product Details


Superheater
Fossil fuel power plants often have a superheater section in the steam generating furnace.The steam passes through drying equipment inside the steam drum on to the superheater, a set of tubes in the furnace. Here the steam picks up more energy from hot flue gases outside the tubing, and its temperature is now superheated above the saturation temperature.
Reheater
Power plant furnaces may have a reheater section containing tubes heated by hot flue gases outside the tubes. Exhaust steam from the high-pressure turbine is passed through these heated tubes to collect more energy before driving the intermediate and then low-pressure turbines.
Type | Advantages | Disadvantages | Supporting method |
Pendant-type | 1.Firm structural support | 1. Flow blockage by condensed steam 2. Needs slow restart to purge the water that accumulates in the bottom. | supported from above |
Inverted-type | 1.Proper drainage of the condensed steam | 1. Lack the structural rigidity, especially in high speed gas flow | Supported from below |
Horizontal -type | 1. Proper drainage 2. Good structural rigidity | 1. They do not view the flam directly so they are mainly from the convective type | Usually supported in the vertical gas ducts parallel to the main furnace. |
Function
Superheater is to increase the temperature of the steam above its saturation point.
Reheater is basically a superheater that superheats steam exiting the high-pressure stage of a turbine. The reheated steam is then sent to the low-pressure stage of the turbine. By reheating steam between high-pressure and low-pressure turbine it is possible to increase the electrical efficiency of the power plant cycle beyond 40%.The reheat cycle is used in large power boilers since it is feasible economically only in larger power plants.










Addr : No.1 Dongli Road , Donglai , Zhangjiagang City , Jiangsu Province , China
Tel : +86 (0) 512 5866 6196
Fax : +86(0) 512 5877 4453
Web : www.boilerfabrication.com


Ordering and Pricing
- Minimum order quantity: 20 ton
- Volume pricing:
- 20–24 ton: US $2800 / ton
- 25+ ton: US $2700 / ton
- Ships from: China
- Customization: OEM and ODM accepted on qualifying volumes.
Frequently Asked Questions
What is the minimum order quantity for this steam boiler?
The standard minimum order quantity is 20 ton. Trial orders can usually be arranged for buyers evaluating the product before a full production run.
What warranty is provided?
The manufacturer provides a 1 Year warranty. Spare parts and technical support remain available after the warranty period.
Do you accept OEM or custom branding?
Yes. Custom logo, colour, packaging and specification changes are accepted on qualifying order volumes. Send your artwork and technical requirements with your enquiry.
How long does production and delivery take?
In-stock configurations typically ship within 7–15 days. Customised or large-volume orders are usually produced in 25–35 days, confirmed on order.
About the Manufacturer
This product is produced by Zhangjiagang Hua Dong Boiler Co., Ltd., based in China. The company 10 years as a verified Alibaba.com supplier, operates its own manufacturing, passed third-party supplier assessment. Browse the full Zhangjiagang Hua Dong Boiler Co., Ltd. range on HVACR Nexus.
See more in Boiler Parts on HVACR Nexus.




















