Product descriptions from the supplier







2. The impeller manufacturing process is as follows: It is suitable for ventilation and exhaust in office buildings, shopping malls, theaters, hospitals, factory workshops, basements and other places. The conveyed gas should be free of viscous substances, and the gas temperature should not exceed 80 degrees or more than 150mg/m3. Media content quality.
Sweet tip:
1. About product customization: We can customize the processing according to customer requirements.
2. About engineering installation: We can arrange professional engineers to conduct on-the-spot investigations, give professional solutions, and arrange professional engineering teams to go to the site for installation and construction.
3. About after-sales: Our equipment will have a one-year shelf life, we can provide repair and replacement.
1.Are you a factory?
__Yes, we are a professional exhaust gas treatment manufacturer for more than 22 years.
2.How do you check the goods?
__We inspect all the materials when they arrive, and have sot inspection during production process. All goods will be tested and double inspected before delivery, providing 100% guarantee for clients.
3. How to select the suitable models?
__The parameters above is just for your reference. We need you to provide us the air flow, solvent composition, working hours,etc for our team to design the suitable unit for you.
4.How and when can I get the quotation?
__Send us the inquiry or leave us message. We will get back to you within 5 minutes during the working time. All messages will be replied whenever they comes.
5.What’s your payment terms?
__Usually we accept 100%T/T at present. 50% initial payment,down payment before shipment. Other payment terms can be discussed when order confirmed.
6.Where is your factory Located? How can I visit there?
__We located in Room 101, Building A, No. 270 Xinmu Road, Xinmu Community, Pinghu Subdistrict, Longgang District, Shenzhen City.
7.Do you provide OEM service?
__Yes! We provide OEM & ODM service.
8.What’s the lead time for your goods?
__Normally 25 workdays. For some special parts, the delivery date will be discussed in detail.















Reviews
There are no reviews yet.